CASE STUDY: EASYCOVE & Lifetime Coatings IMPROVE PRODUCTIVITY AND EFFICIENCY TO CLIENTS

A brief description of the project / projects: Cannabis facility located in Marshall, MI. Total size of project is 80,000 SF.

The needs of the client: To have a durable, easy to clean, green coating on their concrete along with a cove base that would help with waterproofing.

Easy Engineering: Why did the client choose your products / solutions?

EASYCOVE: Because our product is plant based with no toxic off gassing to help protect their plants.

E.E: What products / solutions were used?

EASYCOVE: Our plant based floor coating along with the EasyCove base.

E.E: Please describe how was the project implemented.

EASYCOVE: Project was implemented in numerous phases and strategically scheduled in partnership with the client to ensure maximum efficiency and to avoid scheduling conflicts with other trades on site.

E.E: Were there any products with special characteristics used?

EASYCOVE: More affordable and stronger than epoxy, with zero toxic odors, an A-fire rating, and NSF-61 food grade certified. Lifetime Coatings™ has 100% flexibility and will stick to concrete, metal, wood and other surfaces. And did we mention ‘green’? With zero VOC’s your floor will be safe for family, friends and co-workers.

E.E: How did your products / solutions improve productivity for the client?

EASYCOVE: Makes their workspace safer and easier to clean.

E.E: How important was the project / projects for the client?

EASYCOVE: Project was extremely important to the client as it ensured a safe work environment for their teammates as well as the products in the facility.

E.E: What was the client feedback after implementation?

EASYCOVE: Project is not finished at this point.  However, this is one of the top cannabis production companies in the nation, they have used us in multiple facilities across multiple states, and specify our coating into their plans, they are happy with our performance.

E.E: How did the solutions provided improve efficiency for the client?

EASYCOVE: The solutions maximized efficiency due to the minimal maintenance required over the life of the floor enabling teammates to focus time and energy on other facility issues.

E.E: Did the current situation made your company implement differently than usual?

EASYCOVE: Yes, we learned through application how to better schedule installation as well as altered mix of products to ensure a better finished product.

E.E: What are your forecasts for the second half of 2021?

EASYCOVE: $2.7 million.

www.easycove.com

info@easycove.com